Daily Storm Debris Removal Operations


 

 

East Side Debris Removal Operations
11/4/2024
Daily Total: 56 Loads / 1,302 Cubic Yards
Vegetative/Woody: 41 Loads / 973 Cubic Yards
Construction/Demolition: 15 Loads / 329 Cubic Yards
Hauling Units Operating: 10 Units
Cumulative Total: 1,302 Loads / 48,262 Cubic Yards
Link to Daily Progress Report

 

 

West Side Debris Removal Operations
11/4/2024
Daily Total: 53 Loads / 1,230 Cubic Yards
Vegetative/Woody: 24 Loads / 458 Cubic Yards
Construction/Demolition: 29 Loads / 773 Cubic Yards
Hauling Units Operating: 16 Units
Cumulative Total: 2,857 Loads / 76,064 Cubic Yards
Link to Daily Progress Report